智能设计工具
智能光伏云
下载智能光伏App
安装商查询
安装商社区
成功故事
在线体验专区
伙伴介绍
Power-Partner
营销资料中心
成为伙伴
在线支持
服务热线
维保查询
备件查询
保修概览
软件下载
全屋备电
安装视频
FAQ
Perform disconnection detection on optimizers and locate the disconnected ones.
Method 1: Disconnection Detection on the FusionSolar App >
Method 2: Disconnection Detection on the WebUI of the FusionSolar SmartPVMS >
Method 3: Disconnection Detection on the Local Device Commissioning Screen >
When the output is disconnected or the inverter shuts down, the optimizer can adjust the module output voltage to a safe range to ensure the safety of the construction and O&M personnel as well as firefighters.
Method 1: Turn off the AC switch between the inverter and the power grid. >
Method 2: Turn off the DC switch on the inverter. >
Method 3: Connect a switch to the DI and GND ports of the inverter to form a circuit. (For details about which DI port is used, see the corresponding inverter user manual.) The switch is turned on by default. Turn off the switch to trigger a rapid shutdown. >
Replacing an Optimizer (on the FusionSolar App) >
Replacing an Optimizer (on the Local Device Commissioning Screen) >
Checking the PV string resistance >
Disconnection Detection
Rapid Shutdown
Replacing an Optimizer
Checking the PV string resistance
社区
了解更多
设计工具
本站点使用cookies,继续浏览表示您同意我们使用cookies。 Cookies和隐私政策 >